Title from cover. "2/2/09." Includes bibliographical references (section 5/1-4).
Scope Note:
Final environmental impact statement.
Summary:
The purpose of this planning study is to improve Interstate 29 in Woodbury County, Iowa. The project begins approximately 0.7 miles west of the Hamilton Boulevard Interchange and continues approximately 3.5 miles south to approximately 0.25 mile south of the Burlington Northern Santa Fe Railroad Bridge over the Missouri River along the existing I-29 corridor. The proposed project includes expanding the existing four lane roadway to six lanes and improving safety by modifying interchanges. This condensed Final Environmental Impact Statement (Final EIS) summarizes the Draft EIS and reports the final results of the environmental analysis for the Project. The focus is on the changes that have occurred since the publication of the Draft EIS.
OCLC:
(OCoLC)316875020
Locations:
USUX851 -- Iowa State University - Parks Library (Ames)
IAOX771 -- State Library of Iowa (Des Moines)
OVUX522 -- University of Iowa Libraries (Iowa City)
This resource is supported by the Institute of Museum and Library Services under the provisions of the Library Services and Technology Act as administered by State Library of Iowa.