The Locator -- [(subject = "Soil stabilization")]

351 records matched your query       


Record 36 | Previous Record | MARC Display | Next Record | Search Results
Author:
Hoppe, Edward J.
Title:
Performance of a pile-supported embankment / Edward J. Hoppe, Stanley L. Hite.
Publisher:
Virginia Transportation Research Council,
Copyright Date:
2006
Description:
iii, 27 p. : ill. ; 28 cm.
Subject:
Roads--Virginia--Evaluation.--Evaluation.
Earth pressure--Measurement.
Soil stabilization.
Embankment foundations.
Piles (Supports).
Field tests.
Other Authors:
Hite, Stanley L.
Virginia Transportation Research Council.
Virginia Dept. of Transportation.
United States. Federal Highway Administration.
Notes:
"June 2006" Includes bibliographical references (p. 21).
Scope Note:
Final report.
Summary:
The purpose of this study was to evaluate the field performance of the first pile-supported highway embankment constructed in Virginia. The project involved construction of an approach to the new bridge over the Mattaponi River, replacing the existing Lord Delaware Bridge at West Point. The scope of work included field instrumentation and data gathering as related to stress transfer and settlement. The objective was to measure actual soil pressures that are exerted at the geotextile fabric bridging pile caps and to measure stresses acting over pile caps. In addition, data analysis was to be carried out to provide information that VDOT engineers could use to optimize future designs of pile-supported embankments. This report contains field monitoring data and analysis. Prestressed concrete piles were driven at 7-ft (2.1 m) spacing and topped with 3 ft by 3 ft (0.9 m by 0.9 m) precast concrete pile caps. Several layers of high-strength geosynthetic fabric were used for base reinforcement. The maximum embankment height was approximately 6 ft (1.8 m). Earth pressure sensors installed onsite confirmed the formation of soil arching in the embankment fill between columns. Numerical analysis pointed to the large impact of the upper foundation soil layer properties on the magnitude of the final embankment settlement and fabric strain. This shows that accurate material characterization is essential for a cost-effective design. Construction of the pile-supported embankment was carried out by a general contractor. No specialized equipment or methods were required. A rapid increase in the subgrade bearing capacity was observed as the construction proceeded. This method appears particularly well suited to time-critical projects.
Series:
VTRC ; 06-R36
OCLC:
(OCoLC)70171561
Locations:
Z7OX851 -- Library (Ames)

Initiate Another SILO Locator Search

This resource is supported by the Institute of Museum and Library Services under the provisions of the Library Services and Technology Act as administered by State Library of Iowa.