58 records matched your query
01694aam a2200325Ia 4500 001 CAD5019E493111E49277FB87DAD10320 003 SILO 005 20141001010218 008 071115s1975 txu 000 0 eng d 035 $a (OCoLC)181335168 040 $a UIG $c UIG $d SILO 043 $a n-us-ia 110 2 $a Wilbur Smith and Associates. $9 32462 245 10 $a Seventh avenue study interim report. 246 34 $a Interim report Seventh Avenue study 260 $a [Houston, Texas] : $b The Associates, $c 1975. 300 $a 24 leaves : $b ill. ; $c 28 cm. 500 $a "March, 1975." 520 $a Objectives of the Seventh Avenue Study are to make evaluations of operations and safety and to develop a recommended implementation program for roadway and traffic operations improvements. The recommended program is to include immediate-action improvements, short-range (2-5 years) improvements, and long-range (5+ years) improvements. The study section is approximately 3.9 miles long and extends from the intersection of First Avenue and Collins Road along Marion Boulevard and Seventh Avenue (U.S. Highway 151) to its intersection with Iowa Highway 13. In this report, general reference to Seventh Avenue also includes Marion Boulevard. 536 $a Prepared for the City of Marion, Iowa. 650 0 $a Streets $z Marion. $z Marion. 650 0 $a Traffic flow $z Marion. $z Marion. 650 7 $a Accident locations. $2 trt 650 7 $a Pedestrian flow. $2 trt 650 7 $a Traffic control devices. $2 trt 710 1 $a Marion (Iowa) 941 $a 1 952 $l IAOX771 $d 20240710101610.0 956 $a http://locator.silo.lib.ia.us/search.cgi?index_0=id&term_0=CAD5019E493111E49277FB87DAD10320 994 $a C0 $b UIGInitiate Another SILO Locator Search