The Locator -- [(author = "Rand Corporation issuing body")]

148 records matched your query       


Record 20 | Previous Record | Long Display | Next Record
03192aam a2200433Ii 4500
001 261077786B5411E69AFE1DDBDAD10320
003 SILO
005 20160826010517
008 160512t20162016caua     b    000 0 eng d
020    $a 0833094157
020    $a 9780833094155
035    $a (OCoLC)949727082
040    $a FXG $b eng $e rda $c FXG $d FXG $d TXA $d BDX $d KSG $d KSU $d YDXCP $d IWA $d SILO
043    $a n-us---
050  4 $a V825.3 Y37x 2016
100 1  $a Yardley, Roland J., $e author.
245 10 $a Extending depot length and intervals for DDG-51-class ships : $b examining the 72-month operational cycle / $c Roland J. Yardley, Daniel Tremblay, Brian Perkinson, Brenna Allen, Abraham Tidwell, Jerry M. Sollinger.
246 1  $a Examining the 72-month operational cycle
264  1 $a Santa Monica, Caif. : $b RAND Corporation, $c [2016]
300    $a xxiii, 97 pages : $b color illustrations ; $c 23 cm
490 1  $a [Research report] ; $v RR-1235-NAVY
520    $a "The Navy is seeking ways to operate its ships more cost-effectively. One approach might be to alter the employment schedules of Navy surface vessels to get the greatest benefit in terms of operating efficiency and crew effectiveness. The Navy is currently transitioning from a 32-month to a 36-month cycle, but adopting a 72-month operational cycle could increase the time surface vessels are deployed, allow for multiple deployments between depot availabilities, reduce the number of basic training periods, and achieve some cost savings by removing the crews during the depot maintenance period. This report assesses a 72-month operational schedule followed by an extended depot maintenance period for one class of ships - the DDG-51 Arleigh Burke class of destroyers - to determine what cost and efficiency benefits this approach might yield. The authors find that this longer cycle would lead to a modest increase in operational availability but also to an increase in maintenance costs, and that it would require the Navy to better address ongoing maintenance issues that have accrued over the years"--Back cover.
504    $a Includes bibliographical references (pages 93-97).
505 0  $a DDG-51 fleet and employment scheduling -- Addressing maintenance demands in the 72-month cycle -- DDG-51 manpower and training -- Effect of a longer operational cycle on personnel tempo and operating tempo -- Scheduling model and its outputs -- Findings, conclusions, and recommendations.
610 10 $a United States. $b Navy $x Operational readiness.
610 20 $a Arleigh Burke (Destroyer)
650  0 $a Destroyers (Warships) $z United States $x Maintenance and repair.
700 1  $a Tremblay, Daniel, $e author.
700 1  $a Perkinson, Brian, $e author.
700 1  $a Allen, Brenna, $e author.
700 1  $a Tidwell, Abraham, $e author.
700 1  $a Sollinger, Jerry M., $e author.
710 2  $a National Defense Research Institute (U.S.), $e sponsoring body.
710 2  $a Rand Corporation, $e issuing body.
830  0 $a Research report (Rand Corporation) ; $v RR-1235-NAVY.
941    $a 1
952    $l USUX851 $d 20160826051658.0
956    $a http://locator.silo.lib.ia.us/search.cgi?index_0=id&term_0=261077786B5411E69AFE1DDBDAD10320
994    $a C0 $b IWA

Initiate Another SILO Locator Search

This resource is supported by the Institute of Museum and Library Services under the provisions of the Library Services and Technology Act as administered by State Library of Iowa.