Defense acquisitions [electronic resource] : timely and accurate estimates of costs and requirements are needed to define optimal future strategic airlift mix : report to the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives.
Title from title screen (viewed on Nov. 25, 2008). "November 2008." Includes bibliographical references. "GAO-09-50."
Summary:
The Department of Defense's (DOD) C-5 Galaxy and C-17 Globemaster III aircraft play key roles in transporting weapons and other cargo. Since September 2001, these aircraft have delivered over 2.4 million tons of cargo to staging and operating bases in Iraq and Afghanistan. Yet determining the number and mix to meet current and future airlift requirements has become increasingly challenging given distinct differences between the two aircraft. While the C-5 can carry more cargo, the newer C-17 is more flexible since it can deliver to forward-deployed bases and has a higher mission capable rate. GAO was asked to identify the impact C-5 modernization cost increases have had on the mix of aircraft; assess the current C-5 modernization cost estimate; and identify C-17 production plans and issues related to production line shutdown. To conduct its work, GAO reviewed options DOD considered to meet its current and future strategic airlift requirements, and evaluated C-5 modernization and C-17 production line shut down cost estimates. GAO is making recommendations to help DOD identify the appropriate strategic airlift mix and improve cost estimates for the C-5 program and C-17 production shutdown.
OCLC:
(OCoLC)276377159
Locations:
USUX851 -- Iowa State University - Parks Library (Ames)
This resource is supported by the Institute of Museum and Library Services under the provisions of the Library Services and Technology Act as administered by State Library of Iowa.